All service areas

Banke District · Lumbini Province

Home automation & solar
in Nepalgunj.

Nepalgunj is our mid-western hub. The heat here is serious — 45°C summer peaks aren't unusual — and that shapes every installation we do, from inverter placement to smart-lock battery selection. Our Nepalgunj client base skews commercial (hospitals, shops, hotels) with growing residential demand in Lalitpurawa and Dhambojhi.

Installations here
60+
Commercial share
~55%
Travel from KTM
13 hours / 55-min flight
Mega Solar Energy installation work in Nepalgunj, Nepal

On the ground in Nepalgunj

What's different here.

Nepalgunj's extreme heat is a real engineering constraint. Standard-spec smart-lock batteries drop from 18 months to 6 months here. We only install high-temperature-rated (65°C) hardware in Nepalgunj and spec thermal shade for outdoor inverters. Don't accept a Kathmandu-spec quote for Banke.

Proximity to the Indian border (Rupaidiha, 6 km south) makes Nepalgunj a trading hub. Our commercial customers here are often warehouses, trading offices, and customs-clearing agencies — all requiring access control, CCTV, and in some cases biometric attendance systems.

The hospital segment is significant: Bheri Hospital and two private hospitals upgraded their access control and CCTV through us in 2023–2024. Healthcare installs require strict documentation and audit trails — we use NVR platforms that support multi-year log retention.

Solar in Nepalgunj has the highest annual irradiance of any of our service cities (5.6 kWh/m²/day) but the worst summer performance due to dust and ambient temperature derating. Net output is still excellent — a 3 kW system produces ~5,200 kWh/year here, ~25% more than Kathmandu.

Travel logistics: 13 hours from Kathmandu by road, 55-min flight. We batch Nepalgunj projects every 6–8 weeks. One-time travel/logistics: NPR 25,000–35,000 for single jobs. Crew stays 5–7 days per trip to amortise travel cost across multiple installs.

Nearest NEA office
NEA Nepalgunj Distribution Centre. Net-metering Sun–Fri 10:00–16:00.
Solar irradiance
5.6 kWh/m²/day average (highest annual total; summer derate significant)
Monsoon impact
June–August: short but intense monsoon. August–September: occasional flooding in low-lying wards. Scheduling plans around confirmed dry windows.
Typical pricing
Nepalgunj residential pricing matches Kathmandu with NPR 25,000–35,000 one-time travel. High-heat hardware adds ~8% to BOM. Commercial quoted per site.

Recent projects in Nepalgunj

Where we've been working.

  1. 01Hospital · Surkhet RoadSurkhet RoadAccess control + biometric attendance + CCTV · 2024
  2. 02Warehouse · KohalpurKohalpurPerimeter CCTV + ANPR barrier · 2023
  3. 03Residence · DhambojhiDhambojhiHome automation (heat-spec) + 5 kW solar · 2024
  4. 04Trading office · New RoadNew RoadAccess control + smart lighting · 2024

Project names anonymised at customer request. Reference photos and named references available on enquiry.

Ready to switch —

Let's design your
clean system.

Free site assessment. Transparent quote. No pushy sales — just engineers who'll tell you what actually fits your roof and your budget.

Solar installation

12+ years · 1,500+ installations

Nepal's trusted clean-energy partner.

Assistant —

Mega Solar

Hi — I'm the Mega Solar assistant. Pick a question below or ask your own.

Quick questions